By ISN Garage Assist on Monday, 26 February 2024
Category: Case Studies

Kwik Fit Banbury

Location: Banbury
Project: Recessed Scissor Lift Supply + Installation

Installation engineers Nigel O'Neill and Sam Orr did a full-spectrum job as they dismantled and removed the old lift, before undertaking a modification of the existing recess and installing the new Rotary.

The installation work was completed in just one day, minimising disruption at what is a phenomenally busy centre, and getting it back to maximum capacity as quickly as possible.

"It's great to have a fully functioning lift available again. The team from ISN Garage Assist worked tirelessly to ensure everything was completed to an exceptional standard in the shortest possible time."

That was the feedback from Kwik Fit Centre Manager Tony Howe after ISN Garage Assist recently upgraded them with a new Rotary DS35 Recessed Scissor Lift.